top of page
THE LABOR OFFICE - HAFER ALBATEN
The Labor Office Project in Hafer Albaten consists of a three storey building; basement, ground floor, and first floor with a total area of 4000 m², and it contains a space frame steel structure with an area of 390 m²
Hollow-core (HC) precast slabs were used for the ceilings and were manufactured and supplied by Bina Precast.
The duration of the project was 28 months and was consulted by Aljoaini Consulting Office.
Side View
Rear View
3d perspective
Side View
1/19
bottom of page